Basic and detailed projects

linie

SPECIFIC ACTIVITIES (TABLE OF CONTENT)

linie

Elaboration of documentations on categories of engineering specialties, e.g: layouts, processes description, balances of materials, gases, energy, calculation of manufacturing departments, equipments specifications, material lists, utilities, workshop drawings for equipments, machinery, erection drawings for installations and constructions performing, etc.

ENDOWMENTS

linie

Technique of calculation and dedicated programs, equipments for topo survey and investigations (digital camera, laser distance meters, scanning device, measuring and control devices) equipments for documents processing (scanning, printing, filing)

REFERENCES

linie

Representative works

  1. Unloading, loading, dosing fly ash at CEMINTER – CONSTANŢA
  2. Transport of electrofilter dust from electrofilter raw meal mills, fields 2 and 3 to cement mills and from the field 1 to cement mills or to homogenization silos – Deva
  3. Replacement of actual system of homogenization – fluidization at meal silo – LAFARGE S.A – Hoghiz working point.
  4. Dedustind duct from grate cooler to bags filter – working point Hoghiz – LAFARGE SA, 2011
  5. Relocation primary air fan at the burning installation line 2 at CARPATCEMENT SA, Bicaz Branch, 2011
  6. Radial – axial expansion joint Ø3350 x 1500 mm at the duct from the fan VR to cooling tower and meal mill – CARPATCEMENT SA, Bicaz Branch, 2010
  7. Technological steel structures for bagging and palletized dispatch department of cement at CEMROM Constanta, 2010
  8. Supplementary execution details at the project of electrofilter dust transport  from meal mills, bin of reception dust and transfer to cement mills elevators – CARPATCEMENT HOLDING SA, 2010
  9. Study for “Alternative variant for fluidization of existing  feeding of rubber tires and wood wastes, at the kiln no. 2 ” – CARPATCEMENT HOLDING SA,  Bicaz Branch, 2010
  10. Execution and equipment delivery,  steel structures for supporting and steel structures for “Transport of wood wastes to clinker kiln no. 2” – CARPATCEMENT HOLDING SA, 2010
  11. Project of equipments execution for “Installation of packing – bagging, palletizing and cement packing in plastic sheets at CEMROM Constanţa” and other elements of connection, so that the installation to operate unitary –  CEMROM Constanta, 2010
  12. Projects Engineering, Basic and Detail Design, and equipments delivery for “Hot gases duct from the grate cooler line 2 to dust storage chamber of existing duct from slag dryer line 1” – CARPATCEMENT HOLDING SA – Bicaz Branch, 2010
  13. Project Engineering, Basic and Detail Design for “Transport electrofilters dust from  raw meal mills no. 1 and directly to cement mills without buffer bin” – CARPATCEMENT HOLDING SA, Bicaz Branch, 2010
  14. Execution project for the assembly ducts stage IV, including the flaps from the stage 4, CARPATCEMENT HOLDING SA, Deva, Fieni Branches, 2010
  15. Duct for preheater hot gases line 2 at coal mill CARPATCEMENT HOLDING SA, Bicaz Branch, 2009
  16. Duct for transport coal dust from coal mill to rotary kiln burner line 2 at CARPATCEMENT HOLDING SA, Bicaz Branch, 2009
  17. Dust transport from electrofilter raw meal mills to cement mills MC1 and MC3 with pneumatic pump at CARPATCEMENT HOLDING SA , Bicaz Branch, 2009
  18. Hot gases duct from grate cooler line 2 to slag dryer from line 1 at CARPATCEMENT HOLDING SA, Bicaz Branch, 2009