Technical Support for the Construction and Installation of Equipment and Systems
ACTIVITY SCOPE (CONTENT FRAMEWORK)
- Monitoring compliance with equipment installation and assembly designs
- Performing necessary adjustments during equipment assembly, commissioning, and operation
- Verifying the presence of maintenance platforms and spaces in accordance with documentation
- Verifying the implementation of occupational safety measures during operation
- Preparing inspection reports and solutions to ensure adherence to design parameters
1.015
EQUIPMENT
- Length measurement instruments such as: calipers, tape measures, laser distance meters, etc.
- Surveying theodolite for leveling and installation elevations
- Digital cameras
REFERENCES
Representative projects
- Utilization of electrostatic precipitator dust from raw meal mills in cement grinding – CARPATCEMENT HOLDING SA, Bicaz Branch, 2009
- Fluidization system for the 1,500 m³ filler silo bottom – CARPATCEMENT HOLDING, Bicaz Branch, 2009
- Modernization of the heat exchanger (Line 2) – CARPATCEMENT HOLDING SA, Bicaz Branch, 2008
- Utilization of hot gases from the Line 2 heat exchanger for the coal mill – CARPATCEMENT HOLDING SA, Bicaz Branch, 2008