{"id":5393,"date":"2010-04-29T10:29:05","date_gmt":"2010-04-29T08:29:05","guid":{"rendered":"http:\/\/www.ceprocim.ro\/?page_id=5393"},"modified":"2011-07-29T13:01:26","modified_gmt":"2011-07-29T10:01:26","slug":"lucrari-finalizate","status":"publish","type":"page","link":"https:\/\/www.ceprocim.ro\/en\/noutati\/anunturi\/lucrari-finalizate\/","title":{"rendered":"Finalised works"},"content":{"rendered":"<div style=\"text-align: left;\"><img loading=\"lazy\" src=\"http:\/\/cepro-test.dev.pentruweb.ro\/wp-content\/uploads\/2010\/03\/linie_rosie_f_mare.jpg\" alt=\"linie\" width=\"600\" height=\"1\" \/><\/div>\n<p style=\"padding-left: 30px;\">\n<p style=\"padding-left: 30px;\"><strong>JULY 2011<\/strong><\/p>\n<li>CARPATCEMENT HOLDING \u2013 Monitoring of powders and gases emissions\u00a0 in the flow sheet at Deva cement plant<\/li>\n<li>CARPATCEMENT HOLDING \u2013 Monitoring of powders and gases emissions\u00a0 in the flow sheet at Fieni cement plant<\/li>\n<li>CARPATCEMENT HOLDING \u2013 Evaluation of air pollution (powders imissions in suspension PM10, determination of noise level day) at Deva cement plant<\/li>\n<li>HOLCIM ROM\u00c2NIA \u2013 Ciment Ale\u015fd \u2013 Performing the determinations according to the TEST HOUSE<\/li>\n<li>HOLCIM ROM\u00c2NIA &#8211; Ciment Turda \u2013 Monitoring of powder imissions and of noise level in the environment<\/li>\n<li>TECHNO RECYCLING ORADEA \u2013 Monitoring of powder emissions at fluff installation (wastes chopping), of powder imissions in suspension and of noise level in the environment for Chi\u015fc\u0103daga working point<\/li>\n<li>ECO INDUSTRIAL CONSULTING \u2013 Determination of vibrations at equipments<\/li>\n<p style=\"padding-left: 30px;\">\n<p style=\"padding-left: 30px;\">\n<p style=\"padding-left: 30px;\"><strong>JUNE 2011<\/strong><\/p>\n<li>CARPATCEMENT HOLDING \u2013 Monitoring of powders and gases emissions\u00a0 in the flow sheet at Bicaz cement plant;<\/li>\n<li>CARPATCEMENT HOLDING \u2013 Monitoring of powders and gases emissions\u00a0 in the flow sheet at Deva cement plant;<\/li>\n<li>CARPATCEMENT HOLDING \u2013 Monitoring of powders and gases emissions\u00a0 in the flow sheet at Fieni cement plant;<\/li>\n<li>CARPATCEMENT HOLDING \u2013 Evaluation of air pollution (powders imissions in suspension PM10, total powders in suspension, determination of noise level day and night ) at Bicaz cement plant;<\/li>\n<li>CARPATCEMENT HOLDING \u2013 Evaluation of air pollution (powders imissions in suspension PM10, total powders in suspension, determination of noise level day and night ) at Deva cement plant;<\/li>\n<li>CARPATCEMENT HOLDING \u2013 Evaluation of air pollution (SO<sub>2<\/sub> emissions, powders imissions in suspension PM10, total powders in suspension, determination of noise level day and night ) at Fieni cement plant;<\/li>\n<li>CARMEUSE HOLDING \u2013 Monitoring of gases and powders emissions in the flow sheet at Fieni working point<\/li>\n<li>CARMEUSE HOLDING \u2013 Monitoring of powders imissions in suspensions, gases and noise level in the environment at Chiscadaga working point;<\/li>\n<li>HOLCIM ROMANIA \u2013 Determination of massic concentrations of dioxins, furans, heavy metals and mercury at Ale\u015fd working point<\/li>\n<li>R.T.F.C. Gala\u0163i \u2013 Determination of noise level in the environment and of quality for waste and phreatic waters in the sub-unities M\u0103r\u0103\u015fe\u015fti, Tecuci, Gala\u0163i, F\u0103urei, Buz\u0103u<\/li>\n<p style=\"padding-left: 30px;\">\n<p style=\"padding-left: 30px;\"><strong>MAY 2011<\/strong><\/p>\n<li>Technical project of environment recovery for the gypsum quarry Cerasu &#8211; Valea Lespezi &#8211; CARPATCEMENT HOLDING SA, Fieni branch.<\/li>\n<li>Geological and environment documentations (\u201eTechnical project of environment recovery\u201d, \u201eInitial plan for activity stopping and monitoring program of post-closing environment factors\u201d, \u201eStudy of evaluation of social impact and the plan of attenuation for social impact\u201d) for the limestone quarry Lespezi &#8211; CARPATCEMENT HOLDING SA, Fieni branch.<\/li>\n<p style=\"padding-left: 30px;\"><strong>APRIL 2011<\/strong><\/p>\n<li>Installation of dry mortars, multibat and sand \u2013 Feasibility and design study &#8211; LAFARGE CIMENT Hoghiz.<\/li>\n<li>Monitoring of powders and gases emissions in the flow sheet at Bicaz cement plant &#8211; CARPATCEMENT HOLDING SA.<\/li>\n<li>Monitoring of powders and gases emissions in the flow sheet at Fieni cement plant &#8211; CARPATCEMENT HOLDING SA.<\/li>\n<li>Monitoring of powders and gases emissions in the flow sheet at Deva cement plant &#8211; CARPATCEMENT HOLDING SA.<\/li>\n<li>Evaluation of air pollution (SO2 emissions, powder imissions PM10, total powder imissions, noise level) at Fieni cement plant &#8211; CARPATCEMENT HOLDING SA.<\/li>\n<li>Evaluation of air pollution (powder imissions PM10, total powder imissions, noise level) at Bicaz cement plant &#8211; CARPATCEMENT HOLDING SA.<\/li>\n<li>Monitoring of gases and powders emissions in the flow sheet, of powders imissions PM10, powders in suspension and noise level at Fieni working point &#8211; CARMEUSE HOLDING SRL.<\/li>\n<li>Monitoring of gases and powders emissions in the flow sheet, of powders imissions PM10, powders in suspension, determination of underground watera quality at Campulung working point &#8211; HOLCIM Romania.<\/li>\n<p style=\"padding-left: 30px;\"><strong>MARCH 2011<\/strong><\/p>\n<li>Checking of monitoring report regarding greenhouse gases emissions for the year 2010 at the installations from the plants from Campulung and Alesd plants &#8211; HOLCIM (Romania) SA.<\/li>\n<li>Checking of monitoring report regarding greenhouse gases emissions for the year 2010 for the installations afferent to \u00a0Hoghiz and Medgidia plants &#8211; LAFARGE Ciment (Romania) SA.<\/li>\n<li>Checking of monitoring report regarding greenhouse gases emissions for the year 2010 for the working point Fieni, Chiscadaga and Campulung &#8211; CARMEUSE HOLDING SRL.<\/li>\n<li>Checking of monitoring report regarding greenhouse gases emissions for the year 2010 for the cement plants Tasca, Chiscadaga and Fieni &#8211; CARPATCEMENT HOLDING SA.<\/li>\n<li>Consolidation of practices for physical-chemical determinations in cement laboratory, in order to give them the last version of method standards in force \u2013 training course, 2011 &#8211; CARPATCEMENT HOLDING SA, Deva branch.<\/li>\n<li>Report of validation regarding checking of monitoring reports of greenhouse gases emissions for the year 2010 &#8211; THERMO- POWER PLANT Brasov.<\/li>\n<li>Determinations of powders emissions and burning gases at thermal power plant &#8211; SNTFC CFR Marf\u0103 Gala\u0163i.<\/li>\n<li>Determinations of powders emissions and gases in technological flow at cement plant &#8211; Ciment C\u00eempulung, HOLCIM Romania.<\/li>\n<li> Determination of waste water quality &#8211; ARCELOR MITTAL Gala\u0163i.<\/li>\n<p style=\"padding-left: 30px;\">\n<p style=\"padding-left: 30px;\"><strong>FEBRUARY 2011<\/strong><\/p>\n<li>Determination of noise level &#8211; EDF Europe.<\/li>\n<li>Vibrations measurement at equipments &#8211; ECO INDUSTRIAL CONSULTING.<\/li>\n<li>\u201eDisposal of cement lumps in bulk lorries\u201d \u2013 solutions study &#8211; Owner: CARPATCEMENT HOLDING SA, Deva branch.<strong> <\/strong><\/li>\n<p style=\"padding-left: 30px;\">\n<p style=\"padding-left: 30px;\"><strong>JANUARY 2011<\/strong><\/p>\n<li>Measurements concentrations and powders \u2013 Owner: ARCELOR MITTAL Galati<\/li>\n<li>Training course with the following themes:<\/li>\n<ol>\n<p>&#8211; Optimisation of alternative fuels using in burning process<\/p>\n<p>&#8211; Optimisation of clinker grinding<\/p>\n<\/ol>\n<p style=\"padding-left: 30px;\">Owner CARPATCEMENT HOLDING SA.<\/p>\n<li>Relocation primary air fan at the burning installation line 2 at CARPATCEMENT SA, Bicaz branch<\/li>\n<p style=\"padding-left: 30px;\"><strong>DECEMBRIE 2010<\/strong><\/p>\n<p style=\"padding-left: 30px;\"><strong>On December 2010 the following works were finalized:<\/strong><\/p>\n<li>Solution study for repositioning of raw meal flaps from preheater for the stage IV \u2013 Fieni plant.<\/li>\n<li>Solutions study for: \u201eSand introduction in raw meal flow sheet and Installations of storage and filler dispatch\u201d &#8211; Fieni.<\/li>\n<li>Radial \u2013 axial expansion joint \u00d83350 x 1500 mm at the duct from the fan VR to cooling tower and meal mill \u2013 Ta\u015fca.<\/li>\n<li>Monthly checking in a certified laboratory of the characteristics for cements manufactured according to SR EN 197-1:2003, harmonized with the European Directive Products for Constructions \u2013 106\/89 \u2013 Owner: CARPATCEMENT HOLDING SA, Bicaz branch.<\/li>\n<li>Inter-comparison with a neuter and certified laboratory, regarding to application methods of analyze and laboratory tests, checking of accuracy and determinations reproducibility, participation at inter-laboratory tests and at standards elaboration \u2013 Owner: CARPATCEMENT HOLDING SA, Deva branch.<\/li>\n<li>Establishing of cement components according to SR EN 196\u20134, in order to be within type of cement declared by manufacturer \u2013 Owner: CARPATCEMENT HOLDING SA, Deva, Fieni, Bicaz branches<\/li>\n<li>Determination of hydration heat for cement according SR EN 196-9:2004 \u2013Owner: CARPATCEMENT HOLDING SA, Deva, Fieni, Bicaz branches.<\/li>\n<li>Monitoring of gases emissions and powders in technological flow sheet at the cement plant \u2013 Owner: CARPATCEMENT HOLDING SA, Deva, Fieni, Bicaz branches.<\/li>\n<li>Measurements and determinations imposed by the integrated authorization for environment at the working points: CARMEUSE HOLDING SRL.<\/li>\n<li>List of standards, costs and execution terms \u2013 Owner: ASRO.<\/li>\n<li>Monitoring of emissions for heavy metals (electrofilter stack) at Deva, Bicaz, Fieni Branches \u2013 Owner: CARPATCEMENT HOLDING SA.<\/li>\n<li>Measurements concentrations and powders \u2013 Owner: ARCELOR MITTAL Galati.<\/li>\n<li>Monitoring emissions of powders and gases \u2013 Owner: SNTFM CFR Marfa Galati.<\/li>\n<li>Devices \u2013 Sensor on diamond for special applications in cement industry \u2013 Owner: Polytechnic University Bucharest.<\/li>\n<p style=\"padding-left: 30px;\"><strong>Were finalized the phases afferent to the following works:<\/strong><\/p>\n<li>Initial and surveying inspection of dispatch center for cement. Qualitative inspection for batches or quantities of manufacturing for cement &#8211; Owner: UNYECEM SRL.<\/li>\n<li>Initial and surveying inspection of dispatch center of cement and tests on audit samples \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Certification of product conformity Portland Cement with limestone type CEM II\/ A-LL 42,5R \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Analyzes on mud processed sample \u2013 Owner: PETROM SA.<\/li>\n<li>Measurements emissions at cement plants stacks, working point Campulung \u2013 Owner: HOLCIM (Romania) SA.<\/li>\n<p style=\"padding-left: 30px;\"><strong>NOVEMBER 2010<\/strong><\/p>\n<p style=\"padding-left: 30px;\"><strong>In November the following works were finalized:<\/strong><\/p>\n<li>Study regarding relocation position of the dispersion box for raw meal stage 3 in ascendant column \u2013 Deva plant.<\/li>\n<li>Performing of annual electro-energetic balance &#8211; CARPATCEMENT HOLDING SA, Deva branch.<\/li>\n<li>Performing of chemical and physical determinations for material type grinded lime for \u00a0type BCA \u2013 Owner: \u00a0CELCO SA, lime plant.<\/li>\n<li>Annual energetic balance in the conditions of the Ordinance 22\/2008 regarding efficient using of the energy at the cement plants, Deva, Bicaz, Fieni branches.<\/li>\n<li>Evaluation of air and phonic pollution in cement plant area &#8211; Owner: CARPATCEMENT HOLDING SA, Fieni, Bicaz and Deva branches.<\/li>\n<li>Correlation of technical rules concerning to the limit of admitted radioactivity indicator \u00a0in construction products \u00a0based on cement and additions incorporated in these in accordance with European standards \u2013 Owner Ministry of Regional Development and Territory.<\/li>\n<li>Monthly checking in a certified laboratory of the characteristics for cements manufactured according to SR EN 197-1:2003, harmonized with the European Directive Products for Constructions \u2013 106\/89 \u2013 Owner: CARPATCEMENT HOLDING SA, Fieni branch.<\/li>\n<li>Eco \u2013 technologies of rehabilitation and ecological reconstruction of mining perimeters affected by pollution of tailing ponds \u2013 ECOTAILING \u2013 Owner: INCDMRR.<\/li>\n<li>Geological and environment documentations (\u201eTechnical project for environment recovery\u201d, \u201eInitial plan for stopping the activity and monitoring program for environment factors after closing\u201d, \u201eStudy of evaluation for social impact and the plan for social impact attenuation\u201d) for marl quarry Tepeseni \u2013 Owner:\u00a0 CARPATCEMENT HOLDING SA, Bicaz branch.<\/li>\n<li>Geological and environment documentations (\u201cTechnical project for environment recovery\u201d, \u201eInitial plan for stopping the activity and monitoring program for environment factors after closing\u201d, \u201eStudy of evaluation for social impact and the plan for social impact attenuation\u201d) for limestone quarry Bicaz &#8211; Owner CARPATCEMENT HOLDING SA, Bicaz branch.<\/li>\n<li>Inter-comparison with a neuter and certified laboratory, regarding to application methods of analyze and laboratory tests, checking of accuracy and determinations reproducibility, participation at inter-laboratory tests and at standards elaboration \u2013 Owner: CARPATCEMENT HOLDING SA, Deva branch.<\/li>\n<li>Advanced ceramic materials, components of combustion fuel-cells of intermediary temperature (MAT-SOFC) \u2013 Owner: Institute of Physical Chemistry.<\/li>\n<li>Information system for analyze in due time of risk factors for environment and public health TERRA_RO\u201d \u2013 Owner:\u00a0 BEIA Consult International.<\/li>\n<li>Integrated strategy of research for preservation state of some rupester churches\u00a0 in order to restore them and put into value \u2013 Study of case: Corbii de Piatra \u2013 Owner: National University of Arts.<\/li>\n<li>Determination of chemical requirements imposed by the standard SR EN 197-1:2002 for the components from cement, used as minor or major additions (slag, limestone, pozzolana) and chemical complete analyze for fly ash \u2013 Owner:\u00a0 CARPATCEMENT HOLDING SA, Bicaz and Fieni branches.<\/li>\n<p style=\"padding-left: 30px;\"><strong>Were finalized the phases afferent to the following works:<\/strong><\/p>\n<li>Establishing of cement components according to SR EN 196\u20134, in order to be within type of cement declared by manufacturer \u2013 Owner: CARPATCEMENT HOLDING SA, Deva, Fieni, Bicaz branches.<\/li>\n<li>Determination of hydration heat for cement according SR EN 196-9:2004 \u2013 Owner: CARPATCEMENT HOLDING SA, Deva, Fieni, Bicaz branches.<\/li>\n<li>Monitoring of gases emissions and powders in technological flow sheet at the cement plant \u2013 Owner: CARPATCEMENT HOLDING SA, Deva, Fieni, Bicaz branches.<\/li>\n<li>Measurements and determinations imposed by the integrated authorization for environment at the working points: CARMEUSE HOLDING SRL.<\/li>\n<li>Initial and surveying inspection of dispatch center for cement. Qualitative inspection for batches or quantities of manufacturing for cement &#8211; Owner: UNYECEM SRL.<\/li>\n<li>Initial and surveying inspection of dispatch center of cement and tests on audit samples \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Certification of product conformity, Portland cement with limestone type CEM II\/ A-LL 42,5R \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Analyzes on mud processed sample \u2013 Owner: PETROM SA.<\/li>\n<li>Measurements emissions at cement plants stacks, working point Campulung \u2013 Owner: HOLCIM (Romania) SA.<\/li>\n<li>Determination of chemical requirements imposed by the standard SR EN 197-1:2002 for the limestone used as major component\u00a0 at cements obtaining\u00a0 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Personnel training in order to implement in the laboratory CET GOVORA SA of analyze methods specific for the determination of essential relevant requirements \u00a0on fly ash for concrete, manufactured at Govora \u2013 Owner: CET GOVORA SA.<\/li>\n<li> Efficiency of rehabilitation works of hydro-technical constructions and of environment engineering, regarding using of injection works with fluids based on binders composite systems &#8211; Owner: Ministry of Regional Development and Territory.<\/li>\n<p style=\"padding-left: 30px;\"><strong>OCTOBER 2010<\/strong><\/p>\n<p style=\"padding-left: 30px;\"><strong>In October the following works were finalized:<\/strong><\/p>\n<li style=\"text-align: left;\">Execution project for the assembly ducts stage IV, including the flaps from the stage 4<\/li>\n<li style=\"text-align: left;\">Performing of electro-energetic balance Hoghiz\u00a0plant &#8211; Owner: LAFARGE SA<\/li>\n<li style=\"text-align: left;\">Performing of annual electro-energetic balance &#8211; Owner: CARPATCEMENT HOLDING SA, Fieni\u00a0 Branch<\/li>\n<p style=\"text-align: left; padding-left: 30px;\"><strong>SEPTEMBER 2010<\/strong><\/p>\n<p style=\"padding-left: 30px;\"><strong>In September the following works were finalized:<\/strong><\/p>\n<li>Performing of laboratory tests for the products anhydrous lime and hydrated lime from CELCO SA, in order to identify the substances from their composition, such as: calcium oxide and calcium hydroxide, respectively.<\/li>\n<li>Evaluation of air and phonic pollution in cement plant area &#8211; Owner: CARPATCEMENT HOLDING SA, Bicaz branch.<\/li>\n<li>Process audit at cement grinding installation \u2013 Owner: CARPATCEMENT HOLDING SA, Bicaz Branch<\/li>\n<li>Study in order to perform grounding network for electrical installations and protections at atmospheric over-voltages \u2013 Owner:\u00a0 CARPATCEMENT HOLDING SA, Deva branch.<\/li>\n<p style=\"padding-left: 30px;\"><strong>Were finalized the phases afferent to the following works:<\/strong><\/p>\n<li>Establishing of cement components according to SR EN 196\u20134, in order to be within the type declared by cement manufacturer &#8211; Owner:\u00a0 CARPATCEMENT HOLDING SA, Deva, Fieni and Bicaz branches.<\/li>\n<li>Determination of hydration heat of the cement according to SR EN 196-9:2004 \u2013 Owner: CARPATCEMENT HOLDING SA, Deva, Fieni and Bicaz branches.<\/li>\n<li>Monitoring of gases emissions and powders in process flow at cement plant \u2013 Owner: CARPATCEMENT HOLDING SA, Deva, Fieni and Bicaz branches.<\/li>\n<li>Measurements and determinations imposed by integrated authorization of environment for the working points of CARMEUSE HOLDING SRL.<\/li>\n<li>Initial and surveying inspection of cement dispatch center. Qualitative inspection for batches or quantities of cement manufacturing \u2013 Owner: UNYE CEM SRL.<\/li>\n<li>Initial and surveying inspection of cement dispatch center and tests on audit samples \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Certification of conformity for Portland cement product with limestone type CEM\u00a0 II\/A-LL 42,5R \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Determination of chemical requirements imposed by the standard SR EN 197-1:2002 for cement components, used as minor or major additions (slag, limestone, pozzolana) and complete chemical analyze for the fly ash \u2013 Owner: CARPATCEMENT HOLDING SA, Bicaz branch.<\/li>\n<li>Analyses performed on processed mud sample \u2013 PETROM SA.<\/li>\n<p style=\"text-align: left; padding-left: 30px;\"><strong>AUGUST 2010<\/strong><\/p>\n<p style=\"text-align: left; padding-left: 30px;\"><strong> <\/strong><strong>In August were finalized the phases afferent to the following works:<\/strong><\/p>\n<li> Establishing of cement components according to SR EN 196\u20134, in order to be within the type declared by cement manufacturer &#8211; CARPATCEMENT HOLDING SA, Deva, Fieni and Bicaz branches.<\/li>\n<li>Determination of hydration heat of the cement according to SR EN 196-9:2004 \u2013 Owner: CARPATCEMENT HOLDING SA, Deva branch.<\/li>\n<li>Monitoring of gases emissions and powders in process flow at cement plant \u2013 Owner: CARPATCEMENT HOLDING SA, Deva and Fieni branches.<\/li>\n<li>Measurements and determinations imposed by integrated authorization of environment for the working points of CARMEUSE HOLDING SRL.<\/li>\n<li>Initial and surveying inspection of cement dispatch center. Qualitative inspection for batches or quantities of cement manufacturing \u2013 Owner: UNYE CEM SRL.<\/li>\n<li>Initial and surveying inspection of cement dispatch center and tests on audit samples \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Certification of conformity for Portland cement product with limestone type CEM\u00a0 II\/A-LL 42,5R \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Measurements emissions \u00a0at cement plants stacks \u2013 Owner: HOLCIM (Romania) SA.<\/li>\n<li>Complete chemical analyze for the ash from solid fuel and determination of raw meal percent from the fuel at mill outlet \u2013 Owner: CARPATCEMENT HOLDING SA, Deva branch.<\/li>\n<li>Establishing of chemical composition and of mineralogical characteristics for clays &#8211; Owner: CARPATCEMENT HOLDING SA, Deva branch.<\/li>\n<li>Determination of chemical requirements imposed by the standard SR EN 197-1:2002 for cement components, used as minor or major additions(slag, limestone, pozzolana) and complete chemical analyze for the fly ash \u2013 Owner: CARPATCEMENT HOLDING SA, Deva branch.<\/li>\n<li>Supervision of works for the opening of limestone and basalt quarries for the project AL BADIA Ciment (SA) Syria \u2013 Owner: CEMENT PROJECT SERVICES Ltd. United Kingdom (CPS).<\/li>\n<p style=\"padding-left: 30px;\"><strong>JULY <\/strong><strong> 2010<\/strong><\/p>\n<p style=\"padding-left: 30px;\">On July were finalized the phases afferent to the following works:<\/p>\n<li>Establishing of cement components according to SR EN 196\u20134, in order to be within the type declared by cement manufacturer \u2013 Owner: CARPATCEMENT HOLDING SA, Deva, Fieni and Bicaz branches.<\/li>\n<li>Determination of cement hydration heat according to SR EN 196-9:2004 \u2013 Owner: CARPATCEMENT HOLDING SA, Deva and Bicaz branch.<\/li>\n<li>Monitoring of gases emissions and powders in process flow at cement plant \u2013 Owner: CARPATCEMENT HOLDING SA, Deva, Fieni and Bicaz branches.<\/li>\n<li>Measurements and determinations imposed by environment integrate authorization for the working points from CARMEUSE HOLDING SRL.<\/li>\n<li>Initial and surveying inspection of cement dispatch center. Qualitative inspection for batches or quantities of manufactured cement \u2013 Owner: UNYE CEM SRL.<\/li>\n<li>Initial and surveying inspection of cement dispatch center and tests on audit samples \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Certification of product conformity Portland cement with limestone CEM II\/A-LL 42,5R type \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Influence of physical &#8211; mechanical characteristics of the limestone on crushing and grinding efficiency at CARPATCEMENT HOLDING SA.<\/li>\n<li>Performing of preliminary laboratory tests for five types of products for specific constructions FIROS SA.<\/li>\n<li>Determination quality indicators on environment factors: WATER, NOISE and CALIBRATIONS \u2013 Owner: ARCELOR MITTAL Galati.<\/li>\n<li>Supervision of the works for opening the limestone and basalt quarries for AL BADIA Ciment (SA) Syria project \u2013 Owner: CEMENT PROJECT SERVICES Ltd United Kingdom (CPS).<\/li>\n<li>Performing of chemical and physical determinations for materials of type: anhydrous lime, hydrated lime and limestone \u2013 Owner: CELCO SA Constanta.<\/li>\n<li>Participation at interlaboratory tests for cement edition 2009 &#8211; 2010 &#8211; Owner: Lafarge Ciment (Moldova) SA.<\/li>\n<p style=\"padding-left: 30px;\"><strong>JUNE 2010<\/strong><\/p>\n<p style=\"padding-left: 30px;\">On June were finalized the phases afferent to the following works:<\/p>\n<li>Establishing of cement components according to SR EN 196\u20134, in order to be within the type declared by cement manufacturer \u2013 Owner CARPATCEMENT HOLDING SA, Deva, Fieni and Bicaz branches.<\/li>\n<li>Determination of cement hydration heat according to SR EN 196-9:2004 \u2013 Owner CARPATCEMENT HOLDING SA, Deva and Bicaz branch.<\/li>\n<li>Monitoring of gases emissions and powders in process flow at cement plant \u2013 Owner: CARPATCEMENT HOLDING SA, Deva, Fieni and Bicaz branches.<\/li>\n<li>Measurements and determinations imposed by environment integrate authorization for the working points from CARMEUSE HOLDING SRL.<\/li>\n<li>Initial and surveying inspection of cement dispatch center. Qualitative inspection for batches or quantities of manufactured cement \u2013 Owner: UNYE CEM SRL.<\/li>\n<li>Initial and surveying inspection of cement dispatch center and tests on audit samples \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Analyses performed on processed slurry sample \u2013 Owner PETROM SA.<\/li>\n<li>Monthly checking in a certified laboratory of the characteristics for cements manufactured according to SR EN 197-1:2003, harmonized with the European Directive Products for Constructions \u2013 106\/89 &#8211;\u00a0 Owner: CARPATCEMENT HOLDING SA, Bicaz branch.<\/li>\n<li>Influence of physical &#8211; mechanical characteristics of the limestone on crushing and grinding efficiency at CARPATCEMENT HOLDING SA.<\/li>\n<li>Performing of preliminary laboratory tests for five types of products for specific constructions FIROS SA.<\/li>\n<li>Monitoring of powders and noise level in the working points: Revision of wagons &#8211; Galati and Engine Shed Adjud, SNTFM CFR Marfa, Galati branch.<\/li>\n<li>Inter-comparison\u00a0 with a neuter and certified laboratory, regarding to applying of the analyzes methods and laboratory tests, checking the accuracy and determinations reproducibility, participation at interlaboratory tests\u00a0 and at standards elaboration\u00a0 &#8211; Owner: CARPATCEMENT HOLDING SA, Fieni, Deva, Bicaz branches.<\/li>\n<li>Study for \u201eAlternative variant for fluidization of existing feeding of tires and wood wastes, at the kiln no. 2 \u2013Ta\u015fca plant\u201d.<\/li>\n<li>Supplementary execution details at the project of electrofilter dust transport from meal mills, bin of dust reception and transfer to cement mills elevators &#8211; Tasca plant.<\/li>\n<li>Study for \u201eAlternative variant for fluidization of existing feeding of rubber tires and wood wastes, at the kiln no. 2 \u2013 Tasca plant\u201d.<\/li>\n<p style=\"padding-left: 30px;\"><strong>MAY\u00a0 2010<\/strong><\/p>\n<li>Geological technical and environment documentations for renewing exploitation licence for the gypsum quarry Pucioasa (CARPATCEMENT HOLDING SA, Fieni branch).<\/li>\n<p style=\"padding-left: 30px;\"><strong>Were finalized the phases afferent to the following works:<\/strong><\/p>\n<li>Establishing of cement components according to SR EN 196\u20134, in order to be within the type declared by cement manufacturer \u2013 Owner: CARPATCEMENT HOLDING SA, Deva, Fieni and Bicaz branches.<\/li>\n<li>Determination of cement hydration heat according to SR EN 196-9:2004 \u2013 Owner: CARPATCEMENT HOLDING SA, Deva branch.<\/li>\n<li>Monitoring of gases emissions and powders in process flow at cement plant \u2013 Owner: CARPATCEMENT HOLDING SA, Deva, Fieni and Bicaz branches.<\/li>\n<li>Measurements and determinations imposed by environment integrate authorization for the working points from CARMEUSE HOLDING SRL.<\/li>\n<li>Certification of conformity for Portland cement product with limestone type CEM II\/A-LL 42,5R \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Initial and surveying inspection of cement dispatch center. Qualitative inspection for batches or quantities of manufactured cement \u2013 Owner: UNYE CEM SRL.<\/li>\n<li>Chemical complete analyze for the ash from solid fuel and determination of raw meal percent from fuel at mill outlet \u2013 Owner: CARPATCEMENT HOLDING SA, Deva branch.<\/li>\n<li>Initial and surveying inspection of cement dispatch center and tests on audit samples \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Determination of chemical requirements imposed by the standard SR EN 197-1:2002 for limestone used as major component at cement obtaining within CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Analyses performed on processed slurry sample \u2013 Owner: PETROM SA.<\/li>\n<li>Determination of hexavalent chrome content from cements, according to EN 196-10:2004, in certified regime \u2013 Owner: CARPATCEMENT HOLDING SA, Bicaz branch.<\/li>\n<li>Monthly checking in a certified laboratory of the characteristics for cements manufactured according to SR EN 197-1:2003, harmonized with the European Directive Products for Constructions \u2013 106\/89 &#8211;\u00a0 Owner: CARPATCEMENT HOLDING SA, Fieni branch.<\/li>\n<li>Influence of physical &#8211; mechanical characteristics of the limestone on crushing and grinding efficiency at CARPATCEMENT HOLDING SA.<\/li>\n<li>Performing of preliminary laboratory tests for five types of products for specific constructions FIROS SA.<\/li>\n<p style=\"padding-left: 30px; text-align: left;\"><strong>APRIL 2010<\/strong><\/p>\n<li>Project Engineering, Basic and Detail Design for \u201cTransport  electrofilters dust from\u00a0 raw meal mills no. 1 and directly to cement  mills without buffer bin\u201d \u2013 Owner: CARPATCEMENT HOLDING SA, Ta\u015fca Bbanch.<\/li>\n<li>Projects Engineering, Basic and Detail Design, and equipments  delivery  for \u201cHot gases duct from the grate cooler line<strong> <\/strong>2 to  dust storage  chamber of existing duct from slag dryer line 1\u201d &#8211; Owner: CARPATCEMENT  HOLDING SA, Ta\u015fca branch.<\/li>\n<li>Was finalized the paper \u201cScheme of  Interlaboratory Tests for cement (22<sup>nd<\/sup> edition)\u201d  which was  elaborated in 45 copies for the 45 participants from Romania,  Republic  of Moldova, Croatia, Ukraine, Hungary, Lebanon, Turkey.\u00a0The  results  obtained by participants will be discussed in the Seminar for   Interlaboratory Tests, which will take place in the period 10 &#8211; 11 June   2010, in conference room \u201cAndrei Saguna\u201d of Ibis Hotel from Sibiu.<\/li>\n<li>Dimensioning of the necessary of combustions air at clinker kiln in case  of using at primary and alternative fuels burning \u2013 Owner: CARPATCEMENT  HOLDING SA, Fieni branch.<\/li>\n<p style=\"padding-left: 30px;\"><strong>Were finalized the phases afferent to the following works:<\/strong><\/p>\n<li>Establishing of cement components according to SR EN 196\u20134, in order to be within the type declared by cement manufacturer \u2013 Owner: CARPATCEMENT HOLDING SA, Deva, Fieni and Bicaz branches.<\/li>\n<li>Determination of cement hydration heat according to SR EN 196-9:2004 \u2013 Owner: CARPATCEMENT HOLDING SA, Deva branch.<\/li>\n<li>Monitoring of gases emissions and powders in process flow at cement plant \u2013 Owner: CARPATCEMENT HOLDING SA, Deva and Fieni branches.<\/li>\n<li>Measurements and determinations imposed by environment integrate authorization for the working points from CARMEUSE HOLDING SRL.<\/li>\n<li>Certification of conformity for Portland cement product with limestone type CEM\u00a0 II\/A-LL 32,5 R \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Certification of conformity for Portland cement product with limestone type CEM\u00a0 II\/A-LL 42,5 R \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Initial and surveying inspection of cement dispatch center. Qualitative inspection for batches or quantities of cement manufacturing &#8211;\u00a0 Owner: UNYE CEM\u00a0 SRL.<\/li>\n<li>Complete chemical analyze for the ash from solid fuel and determination of raw meal percent from the fuel at mill outlet \u2013 Owner: CARPATCEMENT HOLDING SA, Deva branch.<\/li>\n<li>Initial and surveying inspection of cement dispatch center and tests on audit samples \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Analyses performed on processed slurry sample \u2013 Owner: PETROM SA.<\/li>\n<li>Determination of hexavalent chrome content from cements, according to \u00a0 EN 196-10:2004, in certified regime \u2013 Owner: CARPATCEMENT HOLDING SA,\u00a0 Fieni branch.<\/li>\n<li>Determination of chemical requirements imposed by the standard SR EN 197-1:2002 for cement components, used as minor or major additions \u2013 Owner: CARPATCEMENT HOLDING SA, Fieni branch.<\/li>\n<li>Establishing of chemical composition and of mineralogical characteristics for clays &#8211; Owner: CARPATCEMENT HOLDING SA, Deva branch.<\/li>\n<p style=\"padding-left: 30px; text-align: left;\"><strong>MARCH 2010<\/strong><\/p>\n<li>Project\u00a0 of equipments execution for \u201cInstallation of packing \u2013 bagging,   palletizing and cement packing in plastic sheets at CEMROM Constanta\u201d   and other connection elements, so that the installation to operate as  an  unitary system \u2013 Owner: CEMROM SA Constanta.<\/li>\n<li>List of the standards, costs and execution terms \u2013 Owner: Romanian Association of Standardization \u2013 ASRO.<\/li>\n<li>Intuitive updating of process flow for CARPATCEMENT HOLDING SA (Deva and Bicaz branches) plant and performing of topographical maps of the two plants including the afferent quarries \u2013 Owner: CARPATCEMENT HOLDING SA, Deva and Bicaz branches.<\/li>\n<li>Checking of monitoring report of greenhouse gases emissions for the year 2009 at the installations: Ciment C\u00e2mpulung and Ciment Ale\u015fd \u2013 Owner: HOLCIM (Romania) SA.<\/li>\n<li>Checking of monitoring report of greenhouse gases emissions for the year 2009 \u2013 Owner: CARPATCEMENT HOLDING SA, Fieni branch.<\/li>\n<li>Checking of monitoring reports of greenhouse gases emissions for the year 2009 at LAFARGE CIMENT(ROMANIA) SA, at the installations: Hoghiz &#8211; Bra\u015fov county and Medgidia &#8211; Constan\u0163a county \u2013 Owner: LAFARGE CIMENT (ROMANIA) SA.<\/li>\n<li>Checking of monitoring report of greenhouse gases emissions for the year 2009 at the installations from Doicesti and Urziceni branches \u2013 Owner: SOCERAM SA.<\/li>\n<li>Checking of monitoring report of greenhouse gases emissions for the year 2009, at: \u201e Installation of ceramic tiles manufacturing from burnt clay (tiles, bricks)\u201d Owner: SICERAM SA.<\/li>\n<li>Checking of monitoring report of greenhouse gases emissions for the year 2009 at the installation for ceramic products manufacturing \u2013 Owner: TERAPLAST Bistrita.<\/li>\n<li>Checking of monitoring report of greenhouse gases emissions for the year 2009 at the installation for ceramic products manufacturing \u2013 Owner: Bricks plant Vaslui\u00a0 SRL.<\/li>\n<p style=\"padding-left: 30px;\"><strong>Were finalized the phases afferent to the following works:<\/strong><\/p>\n<li>Initial and surveying inspection of cement dispatch center. Qualitative inspection for batches or quantities of cement manufacturing \u2013 Owner: UNYE CEM SRL.<\/li>\n<li>Initial and surveying inspection of cement dispatch center and tests on audit samples \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Measurements and determinations imposed by environment integrate authorization for the working points from CARMEUSE HOLDING SRL.<\/li>\n<li>Determination of chemical requirements imposed by the standard SR EN 197-1:2002 for the limestone used as major component at cement obtaining \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Works supervision for the opening of limestone and basalt quarries for the project AL BADIA Cement (SA) Syria \u2013 Owner: CEMENT PROJECT SERVICES Ltd, United Kingdom (CPS).<\/li>\n<li>Monitoring of gases emissions and powders in process flow at cement plant \u2013 Owner: CARPATCEMENT HOLDING SA, Deva and Fieni branches.<\/li>\n<li>Monthly checking in a certified laboratory of the characteristics for cements manufactured according to SR EN 197-1:2002, harmonized with the European Directive Products for Constructions \u2013 106\/89 &#8211;\u00a0 Owner: CARPATCEMENT HOLDING SA, Deva branch.<\/li>\n<li>Establishing of cement components according to SR EN 196\u20134, in order to be within the type declared by cement manufacturer \u2013 Owner: CARPATCEMENT HOLDING SA, Deva, Fieni \u00a0and Bicaz branches.<\/li>\n<li>Determination of cement hydration heat according to SR EN 196-9:2004 &#8211; Owner: CARPATCEMENT HOLDING SA, Deva, Fieni and Bicaz branches<\/li>\n<li>Determination of chemical requirements imposed by the standard SR EN 197-1:2002 for cement components, used as minor or major additions \u2013 Owner: CARPATCEMENT HOLDING SA, Bicaz branch.<\/li>\n<li>Analyses performed on processed slurry sample \u2013 Owner: PETROM SA.<\/li>\n<li>Measurements and determinations imposed by environment integrate authorization for the working points from CARMEUSE HOLDING SRL.<\/li>\n<li>Using of fly ash (addition of type II) in concretes, in order to improve resistance characteristics according to the standards and\/or corresponding rules, harmonized with European Directive Products for Constructions \u2013 Owner:\u00a0 MINISTRY OF REGIONAL DEVELOPMENT AND TOURISM.<\/li>\n<li>Assurance of concrete structures which are in special corrosive medium \u2013 Owner: MINISTRY OF REGIONAL DEVELOPMENT AND TOURISM.<\/li>\n<p style=\"padding-left: 30px; text-align: left;\"><strong>FEBRUARY 2010<\/strong><\/p>\n<li>Performing of initial type tests \u00a0in order to certify products conformity \u201eAdhesive for inside ceramic tiles C1 \u2013 CELCO PLAC DDC1 (Sample no. 1)\u201d, \u201eAdhesive for inside ceramic tiles C1 \u2013 CELCO PLAC (Sample no. 1 bis)\u201d, \u201eAdhesive for outside ceramic tiles \u2013 CELCO PLAC DDC2 (Sample no.2)\u201d and \u201eAdhesive for outside ceramic tiles \u2013 CELCO PLAC (Sample no. 2 bis)\u201d, according to \u00a0SR EN 12004:2008, harmonized with European Directive \u00a0Products for Constructions \u2013 106\/89 \u2013 Owner: CELCO S A Constanta.<\/li>\n<li>Influence of operation development in northern sector of \u00a0Malu Rosu quarry on surrounding environment \u2013 Owner: CARPATCEMENT HOLDING SA, Fieni branch.<\/li>\n<li>Checking of monitoring report of greenhouse gases emissions for the year 2009 at lime installations from Campulung, Deva and Fieni plants \u2013 Owner: CARMEUSE HOLDING SRL.<\/li>\n<li>Checking of monitoring report of greenhouse gases emissions for the year 2009 \u2013 Owner: CARPATCEMENT HOLDING SA, Deva and Bicaz branches.<\/li>\n<p style=\"padding-left: 30px;\"><strong>Were finalized the phases afferent to the following works:<\/strong><\/p>\n<li>Establishing of cement components according to SR EN 196\u20134, in order to be within the type declared by cement manufacturer &#8211; Owner:\u00a0 CARPATCEMENT HOLDING SA,\u00a0 Deva, Fieni and Bicaz branches.<\/li>\n<li>Determination of chemical requirements imposed by the standard SR EN 197-1:2002 for cement components, used as minor or major additions \u2013 Owner: CARPATCEMENT HOLDING SA, Deva branch.<\/li>\n<li>Determination of cement hydration heat according to SR EN 196-9:2004 \u2013 Owner: CARPATCEMENT HOLDING SA, Deva branch.<\/li>\n<li>Initial and surveying inspection of cement dispatch center. Qualitative inspection for batches or quantities of cement manufacturing \u2013 Owner: UNYE CEM\u00a0 SRL.<\/li>\n<li>Certification of conformity for Portland cement product with limestone type CEM\u00a0 II\/A-LL 32,5 R \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Analyses performed on processed slurry sample \u2013 Owner: PETROM SA.<\/li>\n<li>Correlation of technical rules concerning to the limit of admitted radioactivity indicator in building materials products based on cement and additions incorporated in these in accordance with European standards \u2013 Owner: MINISTRY OF REGIONAL DEVELOPMENT AND TOURISM.<\/li>\n<li>Efficiency of rehabilitation works for hydro-technical constructions and environment engineering concerning using of injection works with fluids based on binder composite systems \u2013 Owner: MINISTRY OF REGIONAL DEVELOPMENT AND TOURISM.<\/li>\n<p style=\"padding-left: 30px; text-align: left;\"><strong>JANUARY 2010<\/strong><\/p>\n<li>Execution and equipment delivery, \u00a0steel structures for supporting and   steel structures for \u201cTransport of wood wastes to clinker kiln no. 2\u201d \u2013   Owner: CARPATCEMENT HOLDING SA, Ta\u015fca branch.<\/li>\n<p style=\"padding-left: 30px; text-align: left;\"><strong>Were finalized the phases afferent to the following works:<\/strong><\/p>\n<li>Establishing of cement components according to SR EN 196\u20134, in order to be within the type declared by cement manufacturer &#8211; Owner: CARPATCEMENT HOLDING SA, Deva, Fieni and Bicaz branches.<\/li>\n<li>Determination of hexavalent chrome content from cements, according to EN 196-10:2004, in certified regime \u2013 Owner: CARPATCEMENT HOLDING SA, Deva branch.<\/li>\n<li>Initial and surveying inspection of cement dispatch center. Qualitative inspection for batches or quantities of cement manufacturing &#8211; Owner: UNYE CEM\u00a0 SRL.<\/li>\n<li>Initial and surveying inspection of cement dispatch center and tests on audit samples \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Measurements and determinations imposed by environment integrate authorization for the working points from CARMEUSE HOLDING SRL.<\/li>\n<li>Analyses performed on processed slurry sample \u2013 Owner: PETROM SA.<\/li>\n<li>Certification of conformity for Portland cement product with limestone type \u00a0CEM\u00a0 II\/A-LL 32,5 R \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n<li>Certification of conformity for Portland cement product with limestone type \u00a0CEM\u00a0 II\/A-LL 42,5 R \u2013 Owner: CEMINTER INTERNATIONAL SRL.<\/li>\n","protected":false},"excerpt":{"rendered":"<p>JULY 2011 CARPATCEMENT HOLDING \u2013 Monitoring of powders and gases emissions\u00a0 in the flow sheet at Deva cement plant CARPATCEMENT HOLDING \u2013 Monitoring of powders and gases emissions\u00a0 in the flow sheet at Fieni cement plant CARPATCEMENT HOLDING \u2013 Evaluation of air pollution (powders imissions in suspension PM10, determination of noise level day) at Deva [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":43,"menu_order":2,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v17.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ceprocim.ro\/en\/noutati\/anunturi\/lucrari-finalizate\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Finalised worksLucrari finalizate - Ceprocim S.A.\" \/>\n<meta property=\"og:description\" content=\"JULY 2011 CARPATCEMENT HOLDING \u2013 Monitoring of powders and gases emissions\u00a0 in the flow sheet at Deva cement plant CARPATCEMENT HOLDING \u2013 Monitoring of powders and gases emissions\u00a0 in the flow sheet at Fieni cement plant CARPATCEMENT HOLDING \u2013 Evaluation of air pollution (powders imissions in suspension PM10, determination of noise level day) at Deva [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ceprocim.ro\/en\/noutati\/anunturi\/lucrari-finalizate\/\" \/>\n<meta property=\"og:site_name\" content=\"Ceprocim S.A.\" \/>\n<meta property=\"article:modified_time\" content=\"2011-07-29T10:01:26+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/cepro-test.dev.pentruweb.ro\/wp-content\/uploads\/2010\/03\/linie_rosie_f_mare.jpg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"50 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.ceprocim.ro\/#website\",\"url\":\"https:\/\/www.ceprocim.ro\/\",\"name\":\"Ceprocim S.A.\",\"description\":\"Ceprocim Web Site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.ceprocim.ro\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.ceprocim.ro\/en\/noutati\/anunturi\/lucrari-finalizate\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"http:\/\/cepro-test.dev.pentruweb.ro\/wp-content\/uploads\/2010\/03\/linie_rosie_f_mare.jpg\",\"contentUrl\":\"http:\/\/cepro-test.dev.pentruweb.ro\/wp-content\/uploads\/2010\/03\/linie_rosie_f_mare.jpg\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.ceprocim.ro\/en\/noutati\/anunturi\/lucrari-finalizate\/#webpage\",\"url\":\"https:\/\/www.ceprocim.ro\/en\/noutati\/anunturi\/lucrari-finalizate\/\",\"name\":\"Finalised worksLucrari finalizate - Ceprocim S.A.\",\"isPartOf\":{\"@id\":\"https:\/\/www.ceprocim.ro\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.ceprocim.ro\/en\/noutati\/anunturi\/lucrari-finalizate\/#primaryimage\"},\"datePublished\":\"2010-04-29T08:29:05+00:00\",\"dateModified\":\"2011-07-29T10:01:26+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.ceprocim.ro\/en\/noutati\/anunturi\/lucrari-finalizate\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.ceprocim.ro\/en\/noutati\/anunturi\/lucrari-finalizate\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.ceprocim.ro\/en\/noutati\/anunturi\/lucrari-finalizate\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.ceprocim.ro\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nout\\u0103\\u021bi\",\"item\":\"https:\/\/www.ceprocim.ro\/en\/noutati\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Anun\\u021buri\",\"item\":\"https:\/\/www.ceprocim.ro\/en\/noutati\/anunturi\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Lucrari finalizate\"}]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ceprocim.ro\/en\/noutati\/anunturi\/lucrari-finalizate\/","og_locale":"en_US","og_type":"article","og_title":"Finalised worksLucrari finalizate - Ceprocim S.A.","og_description":"JULY 2011 CARPATCEMENT HOLDING \u2013 Monitoring of powders and gases emissions\u00a0 in the flow sheet at Deva cement plant CARPATCEMENT HOLDING \u2013 Monitoring of powders and gases emissions\u00a0 in the flow sheet at Fieni cement plant CARPATCEMENT HOLDING \u2013 Evaluation of air pollution (powders imissions in suspension PM10, determination of noise level day) at Deva [&hellip;]","og_url":"https:\/\/www.ceprocim.ro\/en\/noutati\/anunturi\/lucrari-finalizate\/","og_site_name":"Ceprocim S.A.","article_modified_time":"2011-07-29T10:01:26+00:00","og_image":[{"url":"http:\/\/cepro-test.dev.pentruweb.ro\/wp-content\/uploads\/2010\/03\/linie_rosie_f_mare.jpg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"50 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/www.ceprocim.ro\/#website","url":"https:\/\/www.ceprocim.ro\/","name":"Ceprocim S.A.","description":"Ceprocim Web Site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ceprocim.ro\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","@id":"https:\/\/www.ceprocim.ro\/en\/noutati\/anunturi\/lucrari-finalizate\/#primaryimage","inLanguage":"en-US","url":"http:\/\/cepro-test.dev.pentruweb.ro\/wp-content\/uploads\/2010\/03\/linie_rosie_f_mare.jpg","contentUrl":"http:\/\/cepro-test.dev.pentruweb.ro\/wp-content\/uploads\/2010\/03\/linie_rosie_f_mare.jpg"},{"@type":"WebPage","@id":"https:\/\/www.ceprocim.ro\/en\/noutati\/anunturi\/lucrari-finalizate\/#webpage","url":"https:\/\/www.ceprocim.ro\/en\/noutati\/anunturi\/lucrari-finalizate\/","name":"Finalised worksLucrari finalizate - Ceprocim S.A.","isPartOf":{"@id":"https:\/\/www.ceprocim.ro\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.ceprocim.ro\/en\/noutati\/anunturi\/lucrari-finalizate\/#primaryimage"},"datePublished":"2010-04-29T08:29:05+00:00","dateModified":"2011-07-29T10:01:26+00:00","breadcrumb":{"@id":"https:\/\/www.ceprocim.ro\/en\/noutati\/anunturi\/lucrari-finalizate\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ceprocim.ro\/en\/noutati\/anunturi\/lucrari-finalizate\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.ceprocim.ro\/en\/noutati\/anunturi\/lucrari-finalizate\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ceprocim.ro\/en\/"},{"@type":"ListItem","position":2,"name":"Nout\u0103\u021bi","item":"https:\/\/www.ceprocim.ro\/en\/noutati\/"},{"@type":"ListItem","position":3,"name":"Anun\u021buri","item":"https:\/\/www.ceprocim.ro\/en\/noutati\/anunturi\/"},{"@type":"ListItem","position":4,"name":"Lucrari finalizate"}]}]}},"_links":{"self":[{"href":"https:\/\/www.ceprocim.ro\/wp-json\/wp\/v2\/pages\/5393"}],"collection":[{"href":"https:\/\/www.ceprocim.ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.ceprocim.ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.ceprocim.ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ceprocim.ro\/wp-json\/wp\/v2\/comments?post=5393"}],"version-history":[{"count":142,"href":"https:\/\/www.ceprocim.ro\/wp-json\/wp\/v2\/pages\/5393\/revisions"}],"predecessor-version":[{"id":7510,"href":"https:\/\/www.ceprocim.ro\/wp-json\/wp\/v2\/pages\/5393\/revisions\/7510"}],"up":[{"embeddable":true,"href":"https:\/\/www.ceprocim.ro\/wp-json\/wp\/v2\/pages\/43"}],"wp:attachment":[{"href":"https:\/\/www.ceprocim.ro\/wp-json\/wp\/v2\/media?parent=5393"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}